Hydro power plant Tannuwald, retrofit, lot 13 cables
Publikationsdatum
18.01.2019
Beschreibung
The existing hydroelectric power plant Tannuwald has been commissioned in 1981 with an installed power output of 5194 kW. The power plant is located at 1391 m a.s.l. in the canton of Valais (Switzerland). The Fah reservoir (41’000 m3), which is located about 2790 m upstream the power plant, collects the water at an elevation of 1758 m.a.s.l. After flowing through the penstock, the water is turbined in seven pumps operating as turbines. In the frame of the retrofit project Tannuwald, the seven units will be replaced by 2 identical vertical Pelton groups. The existing 16-kV-cable connection from the Tannuwald power plant to the Sera substation will be replaced by a new one. Between the power plant and the Fah reservoir, a new 16-kV-cable connection is created along the penstock. A new cable connection will be made for the 400-V supply to Alp Cheller from the Fah reservoir.
Kontakt
Energie Electrique du Simplon SA
Chemin de Mornex 10
1001 Lausanne
Dienstleistungen
Firmen-Überwachung
Firmenmonitor.ch informiert Sie über Mutationen aller Firmen, welche im Handelsregister eingetragen sind. Nutzen Sie unseren Service, um sich frühzeitig zu informieren.
www.firmenmonitor.ch »
Firmenadressen kaufen
Für die Erweiterung Ihres Kundenkreises können Firmenadressen individuell gekauft werden.
Rund 750'000 Schweizer Firmenadressen, selektierbar nach Ihren Bedürfnissen.
www.adressenshop.ch »
Neugründeradressen
Abonnieren Sie das tägliche Update aller Firmen, die gerade neu gegründet wurden.
Lassen Sie sich täglich die neugegründenten Firmenadressen als Excel-Datei liefern.
www.neugruenderadressen.ch »